Betonblock® offers the Lift & Turn Mechanism (LTM) and the larger LTMXL for turning and positioning concrete slabs. Both mechanisms attach directly to the forks of a forklift and are designed to turn slabs that have been cast upside down. Below, we answer the most frequently asked questions about choosing and using this handling equipment.
The choice mainly depends on the size of the concrete slab. The standard LTM is intended for concrete slabs measuring 200x200 cm. For larger 300x200 cm concrete slabs, Betonblock® offers the more robust LTMXL. Always select the turning mechanism that corresponds to the dimensions of the slab you need to handle.
Betonblock® offers two versions for different slab sizes. The LTM is designed for 200x200 cm concrete slabs, while the LTMXL is intended for larger 300x200 cm slabs. Choosing the corresponding model allows the handling equipment to be matched to the slab dimensions.
Both the LTM and LTMXL attach directly to the forks of a suitable forklift. This allows the forklift to be used when handling, turning and positioning the concrete slab. Before use, always check that the mechanism is correctly attached and that the forklift, turning mechanism and concrete slab are suitable for the intended handling operation.
Concrete slabs are cast upside down. Once the concrete has cured sufficiently, the LTM or LTMXL can be used with its chains to turn the slab in a controlled manner so that the neat finished surface faces upwards. The mechanism therefore simplifies the handling step between production and final positioning of the slab. Always follow the operating and safety instructions for the equipment when turning concrete slabs.
Yes. Separate lifting hooks are available for the LTM and LTMXL. These hooks can be used to connect to adapted lifting profiles that are cast into the concrete slab during production. This allows the mechanism to be adapted to the lifting configuration being used. Always make sure that the hooks, lifting profiles and other components are compatible and suitable for the concrete slab being handled.