BETONBLOCK®: ACCESSORIES
Everything you need for producing concrete blocks
Betonblock® is your one-stop shop for everything your concrete plant needs.
In our range, you will find not only concrete block moulds but also an
extensive selection of everything you need for producing high-quality concrete
blocks. From an advanced pouring table to a refined smoothing rake, our range
is complete and carefully assembled to meet all your concrete production
needs.
In our range, you will find the following accessories:
-
Concrete mixing bucket;
-
Concrete pouring table;
-
Release agent;
-
Oil pump;
-
Vibrating needle;
-
Smoothing rake;
-
High-pressure cleaner.
Concrete mixing bucket
The concrete mixing bucket from our range is the ideal starting point for
producing concrete in a practical way. You can produce the concrete mixture
easily and quickly - it takes just a few minutes. Our concrete mixing bucket
has a capacity of six hundred litres and weighs 2,180 kilograms when full.
Concrete pouring table
When pouring concrete, you need a smooth surface. But not every construction
site has a flat surface. Therefore, you need a concrete pouring table. Our
pouring table is ideal for pouring concrete blocks and traffic barriers thanks
to its adjustable legs. The dimensions of the pouring table are 250x125x8 cm.
Release agent
The release agent from our range ensures that the concrete does not stick to
your concrete mould while curing. One litre of our release agent covers thirty
to fifty square meters. A twenty-litre jerrycan of release agent is therefore
sufficient to cover at least 600 m². With a 20-litre jerrycan, you can also
cover 150 to 200 moulds with oil, as the inner surface of our
160.80.80 concrete block mould
is 4 m² and that of our
180.60.60 concrete block mould, 3 m².
Oil pump
To apply the release agent to your concrete mould, you need an oil pump. Our
extra-robust oil pump has a capacity of twenty-four litres. You can easily
treat multiple moulds with it, without having to pump manually. Thanks to the
handy wheels at the bottom of the pump, you also do not need lifting equipment
to move the pump.
Vibrating needle
Our vibrating needle is a handy machine of approximately six kilograms that
you use to compact your concrete after pouring it into the mould. The
specially designed 230/115V 1-phase motor drives a flexible shaft with only
4,000 rpm. However, the pendulum vibration system produces 12,000 vibrations
per minute. This ensures perfect concrete compaction.
Smoothing rake
With a smoothing rake, you can smooth the top of your poured concrete in one
go. Our smoothing rake is made of high-quality aluminium (not plastic) with a
long lifespan and is one hundred centimetres long.
High-pressure cleaner
Our mobile high-pressure cleaner is perfect for cleaning concrete blocks or
related products. The high-pressure cleaner operates on a petrol engine and is
independent of power or water connections. You can use the cleaner anywhere.
Fill the water tank with one thousand litres of water and transport the
high-pressure cleaner on a trailer to the desired location on the construction
site or concrete plant.
Why buy all your products from Betonblock®?
✔ All our products are in stock as standard;
✔ We offer the best price-quality ratio;
✔ Worldwide delivery, from Europe to the US;
✔ We have been the market leader in steel concrete moulds for over 15 years;
✔ Reliable partner according to more than 7,500 loyal customers.
The extensive Betonblock® range
Are you looking for a unique, extensive range with the best price-quality
ratio on the market? At Betonblock® you will find what you need. Whether your
concrete plant is located in the Netherlands, elsewhere in Europe, or even in
the United States, you can order your concrete moulds and all accessories from
us and have them delivered to your location. Our moulds, partition walls, and
top plates are made of high-quality S355 structural steel and therefore have a
long lifespan. The concrete moulds in our range last up to ten years, even
with intensive daily use.
Order custom-made products from Betonblock®
Do you want to order concrete moulds, accessories, or other products in
colours, shapes, and sizes that you do not find in our range? Then you can
contact us. There are endless possibilities for custom-made products. Send all
your questions, ideas, and/or designs to
info@betonblock.com. We are happy to provide you with expert custom advice.
More information about concrete production accessories
Would you like to know more about the accessories in the Betonblock® range?
Fill in our
contact form
and our specialists will contact you as soon as possible. See you soon!
Frequently asked questions about accessories for concrete blocks
With the right accessories, you can make the production of concrete blocks easier and more efficient. These include release oil for easy demolding, a concrete vibrator for proper compaction and a mold opener for easily opening the concrete block mold. Below, we answer the most frequently asked questions about accessories used when producing concrete blocks.
How long should you vibrate concrete?
There is no fixed vibration time that applies to every concrete mix and concrete block mold. Vibrate the concrete briefly and carefully at each position until you see that air bubbles have significantly reduced and the concrete around the vibrator is properly compacted. Then move the vibrator to the next position. The required time depends on factors such as the consistency and quantity of the concrete and the dimensions of the mold. Insufficient vibration can cause trapped air and voids, while excessive vibration can lead to segregation of the concrete.
Why shouldn't you stir concrete with a concrete vibrator?
A concrete vibrator is designed to compact concrete, not to move or stir the concrete inside the mold. Lower the vibrator into the concrete in a controlled manner and allow the vibrations to do the work. Using the vibrator as a stirring tool can move the concrete mix unnecessarily or cause segregation. It also increases the risk of the vibrator coming into contact with the steel mold or other components. Work systematically instead and move the vibrator from one position to the next.
Why should you oil concrete molds?
Applying release oil to the inside of the concrete mold before pouring helps prevent the hardened concrete from sticking to the steel mold. This makes the concrete block easier to demold and reduces the risk of damaging the block. Release oil also helps keep the mold clean and protects the steel against corrosion. Applying release oil correctly and regularly therefore also contributes to the maintenance of your concrete molds.
How do I use release oil on my concrete mold?
Before pouring the concrete, apply a thin and even layer of release oil to all internal surfaces of the mold that will come into contact with the fresh concrete. You can use an oil pump with a spray gun to distribute the release oil evenly across the surface. Make sure the entire contact surface is covered and avoid applying excessive amounts of oil in individual areas. The mold is then ready to be filled with concrete.
How soon can you demold concrete?
The right time to demold depends on the concrete mix, temperature, environmental conditions, dimensions of the block and the development of the concrete's strength. Only demold the block once the concrete has gained sufficient strength to retain its shape and be removed without damage. Demolding too early can damage edges, corners or other parts of the concrete block. Always take the properties of the concrete and the curing conditions into account before opening the mold.
Can I use the accessories for concrete slabs, retaining walls and other concrete products?
Several Betonblock® accessories can be used for different types of concrete products. Release oil, oil pumps, finishing tools and cleaning equipment, for example, can also be useful when producing concrete slabs, retaining walls and concrete barriers. Which accessories are suitable depends on the concrete product and mold being used. Always check whether the specific accessory is suitable for your application.
How should I prepare a concrete mold before applying release oil?
Make sure the inside of the concrete mold is clean before applying release oil. Remove any remaining concrete residue and other dirt so that the oil can be distributed evenly across the surface. At the same time, check that the mold and its locking mechanisms are in good condition. Then apply a thin, even layer of release oil to all surfaces that will come into contact with the fresh concrete. The mold is now ready for the next pour.
How much concrete release oil do I need per m²?
One liter of Betonblock® release oil can be used to treat approximately 30 to 50 m² of surface area. A 20-liter container is therefore sufficient for at least 600 m². Actual consumption can vary depending on the application method and the surface of the mold. Apply the oil in a thin and even layer, as using more release oil than necessary does not automatically result in better demolding.
What happens if concrete is vibrated incorrectly?
Incorrect compaction can affect both the appearance and quality of the concrete block. Insufficient vibration can leave trapped air, voids and poorly filled areas in the concrete. This can result in a less even surface and may create weak spots. Excessive or incorrect vibration can cause segregation, where the different components of the concrete mix begin to separate. Use the concrete vibrator carefully and evenly throughout the entire mold.
How do you easily open a concrete block mold?
A Betonblock® concrete block mold can be easily opened using the corresponding mold opener. Once the concrete has hardened sufficiently, first release the locking mechanisms of the mold. Then use the mold opener to carefully separate the mold from the concrete block. If the inside of the mold was properly treated with release oil before pouring, the hardened concrete will separate more easily from the steel mold. Do not force the mold open if the concrete has not hardened sufficiently or if the block is still adhering to the mold.